Requirements management is the process of documenting, analyzing, tracing, prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project. A requirement is a capability to which a project outcome (product or service) should conform.
![]()
The purpose of requirements management is to ensure that an organization documents, verifies, and meets the needs and expectations of its customers and internal or external stakeholders. Requirements management begins with the analysis and elicitation of the objectives and constraints of the organization. Requirements management further includes supporting planning for requirements, integrating requirements and the organization for working with them (attributes for requirements), as well as relationships with other information delivering against requirements, and changes for these.
The traceability thus established is used in managing requirements to report back ful filment of company and stakeholder interests in terms of compliance, completeness, coverage, and consistency. Trace abilities also support change management as part of requirements management in understanding the impacts of changes through requirements or other related elements (e.g., functional impacts through relations to functional architecture), and facilitating introducing these changes.
![]()
Requirements management involves communication between the project team members and stakeholders, and adjustment to requirements changes throughout the course of the project. To prevent one class of requirements from overriding another, constant communication among members of the development team is critical. For example, in software development for internal applications, the business has such strong needs that it may ignore user requirements, or believe that in creating use cases, the user requirements are being taken care of.
Requirements traceability is concerned with documenting the life of a requirement. It should be possible to trace back to the origin of each requirement and every change made to the requirement should therefore be documented in order to achieve traceability. Even the use of the requirement after the implemented features have been deployed and used should be traceable.
Requirements come from different sources, like the business person ordering the product, the marketing manager and the actual user. These people all have different requirements for the product. Using requirements traceability, an implemented feature can be traced back to the person or group that wanted it during the requirements elicitation. This can, for example, be used during the development process to prioritize the requirement, determining how valuable the requirement is to a specific user. It can also be used after the deployment when user studies show that a feature is not used, to see why it was required in the first place.
At each stage in a development process, there are key requirements management activities and methods. To illustrate, consider a standard five-phase development process with Investigation, Feasibility, Design, Construction and Test, and Release stages.
In Investigation, the first three classes of requirements are gathered from the users, from the business and from the development team. In each area, similar questions are asked; what are the goals, what are the constraints, what are the current tools or processes in place, and so on. Only when these requirements are well understood can functional requirements be developed.
In the common case, requirements cannot be fully defined at the beginning of the project. Some requirements will change, either because they simply weren’t extracted, or because internal or external forces at work affect the project in mid-cycle.
The deliverable from the Investigation stage is a requirements document that has been approved by all members of the team. Later, in the thick of development, this document will be critical in preventing scope creep or unnecessary changes. As the system develops, each new feature opens a world of new possibilities, so the requirements specification anchors the team to the original vision and permits a controlled discussion of scope change.
While many organizations still use only documents to manage requirements, others manage their requirements baselines using software tools. These tools allow requirements to be managed in a database, and usually have functions to automate traceability (e.g., by allowing electronic links to be created between parent and child requirements, or between test cases and requirements), electronic baseline creation, version control, and change management. Usually such tools contain an export function that allows a specification document to be created by exporting the requirements data into a standard document application.
In the Feasibility stage, costs of the requirements are determined. For user requirements, the current cost of work is compared to the future projected costs once the new system is in place. Questions such as these are asked: “What are data entry errors costing us now?” Or “What is the cost of scrap due to operator error with the current interface?” Actually, the need for the new tool is often recognized as these questions come to the attention of financial people in the organization.
Business costs would include, “What department has the budget for this?” “What is the expected rate of return on the new product in the marketplace?” “What’s the internal rate of return in reducing costs of training and support if we make a new, easier-to-use system?”
Technical costs are related to software development costs and hardware costs. “Do we have the right people to create the tool?” “Do we need new equipment to support expanded software roles?” This last question is an important type. The team must inquire into whether the newest automated tools will add sufficient processing power to shift some of the burden from the user to the system in order to save people time.
The question also points out a fundamental point about requirements management. A human and a tool form a system, and this realization is especially important if the tool is a computer or a new application on a computer. The human mind excels in parallel processing and interpretation of trends with insufficient data. The CPU excels in serial processing and accurate mathematical computation. The overarching goal of the requirements management effort for a software project would thus be to make sure the work being automated gets assigned to the proper processor. For instance, “Don’t make the human remember where she is in the interface. Make the interface report the human’s location in the system at all times.” Or “Don’t make the human enter the same data in two screens. Make the system store the data and fill in the second screen as needed.”
In product development and process optimization, a requirement is a singular documented physical or functional need that a particular design, product or process aims to satisfy. It is commonly used in a formal sense in engineering design, including for example in systems engineering, software engineering, or enterprise engineering. It is a broad concept that could speak to any necessary (or sometimes desired) function, attribute, capability, characteristic, or quality of a system for it to have value and utility to a customer, organization, internal user, or other stakeholder. Requirements can come with different levels of specificity; for example, a requirement specification or requirement “spec” (often imprecisely referred to as “the” spec/specs, but there are actually different sorts of specifications) refers to an explicit, highly objective/clear (and often quantitative) requirement (or sometimes, set of requirements) to be satisfied by a material, design, product, or service.
A set of requirements is used as inputs into the design stages of product development. Requirements are also an important input into the verification process, since tests should trace back to specific requirements. Requirements show what elements and functions are necessary for the particular project. When iterative methods of software development or agile methods are used, the system requirements are incrementally developed in parallel with design and implementation. With the waterfall model requirements are developed before design and implementation.
The term requirement has been in use in the software engineering community since at least the 1960s.
According to the Guide to the Business Analysis Body of Knowledge® version 2 from IIBA (BABOK), a requirement is:
- A condition or capability needed by a stakeholder to solve a problem or achieve an objective.
- A condition or capability that must be met or possessed by a solution or solution component to satisfy a contract, standard, specification, or other formally imposed documents.
- A documented representation of a condition or capability as in (1) or (2).
This definition is based on IEEE 610.12-1990: IEEE Standard Glossary of Software Engineering Terminology.
Requirements can be said to relate to two fields:
- Product requirements prescribe properties of a system or product.
- Process requirements prescribe activities to be performed by the developing organization. For instance, process requirements could specify the methodologies that must be followed, and constraints that the organization must obey.
Product and process requirements are closely linked; a product requirement could be said to specify the automation required to support a process requirement while a process requirement could be said to specify the activities required to support a product requirement. For example, a maximum development cost requirement (a process requirement) may be imposed to help achieve a maximum sales price requirement (a product requirement); a requirement that the product be maintainable (a product requirement) often is addressed by imposing requirements to follow particular development styles (e.g., object-oriented programming), style-guides, or a review/inspection process (process requirements).
Requirements are typically classified into types produced at different stages in a development progression, with the taxonomy depending on the overall model being used. For example, the following scheme was devised by the International Institute of Business Analysis in their Business Analysis Body of Knowledge (see also FURPS and Types of requirements).
- Architectural requirements
- Architectural requirements explain what has to be done by identifying the necessary integration of systems structure and systems behavior, i.e., systems architecture of a system.
- In software engineering, they are called architecturally significant requirements, which is defined as those requirements that have a measurable impact on a software system’s architecture.
- Business requirements
- High-level statements of the goals, objectives, or needs of an organization. They usually describe opportunities that an organization wants to realise or problems that they want to solve. Often stated in a business case.
- User (stakeholder) requirements
- Mid-level statements of the needs of a particular stakeholder or group of stakeholders. They usually describe how someone wants to interact with the intended solution. Often acting as a mid-point between the high-level business requirements and more detailed solution requirements.
- Functional (solution) requirements
- Usually detailed statements of capabilities, behavior, and information that the solution will need. Examples include formatting text, calculating a number, modulating a signal. They are also sometimes known as capabilities.
- Quality-of-service (non-functional) requirements
- Usually detailed statements of the conditions under which the solution must remain effective, qualities that the solution must have, or constraints within which it must operate. Examples include: reliability, test ability, maintainability, availability. They are also known as characteristics, constraints or the ilities.
- Implementation (transition) requirements
- Usually, detailed statements of capabilities or behavior required only to enable the transition from the current state of the enterprise to the desired future state, but that will thereafter no longer be required. Examples include recruitment, role changes, education, migration of data from one system to another.
- Regulatory requirements
- Requirements defined by laws (Federal, State, Municipal, or Regional), contracts (terms and conditions), or policies (company, departmental, or project-level).
The characteristics of good requirements are variously stated by different writers, with each writer generally emphasizing the characteristics most appropriate to their general discussion or the specific technology domain being addressed. However, the following characteristics are generally acknowledged.
There are many more attributes to consider that contribute to the quality of requirements. If requirements are subject to rules of data integrity (for example) then accuracy/correctness and validity/authorization are also worthy attributes. Traceability confirms that the requirement set satisfies the need (no more – and no less than what is required).
To the above some add Externally Observable, that is, the requirement specifies a characteristic of the product that is externally observable or experienced by the user. Such advocates argue that requirements that specify internal architecture, design, implementation, or testing decisions are probably constraints, and should be clearly articulated in the Constraints section of the Requirements document. The contrasting view is that this perspective fails on two points. First, the perspective does not recognize that the user experience may be supported by requirements not perceivable by the user. For example, a requirement to present geo coded information to the user may be supported by a requirement for an interface with an external third party business partner. The interface will be imperceptible to the user, though the presentation of information obtained through the interface certainly would not. Second, a constraint limits design alternatives, whereas a requirement specifies design characteristics. To continue the example, a requirement selecting a web service interface is different from a constraint limiting design alternatives to methods compatible with a Single Sign-On architecture.